Project Spotlight: 350 Park Avenue, New York, NY by Dan Chavez 

January, 16, 2019 at 02:00

HEA was hired by Citadel LLC to provide commissioning services for 350 Park Avenue, a commercial high-rise building in New York, NY. HEA’s scope of work included all mechanical, electrical and fire protection systems including chilled water pumps, VRFs, CRAC units, VAVs, exhaust fans and electrical panels and all emergency power systems including automatic transfer switches, uninterrupted power systems, static transfer switches and the emergency generator. HEA also worked with installing contractors to develop start-up plans and provide guidelines for several pre-functional requirements including point to point testing, flushing & cleaning piping systems, testing adjust & balancing (TAB), pre-testing of sequence of operations and verification of base building provided systems.

...
 

Spot the Deficiency! January 2019 

January, 03, 2019 at 18:00

Q: What needs to be fixed?

A: This is a deficiency because the duct is going to run into the pipe. Either the pipe or the duct has to be moved. If this was not caught by the commissioning process, the project would not be able to continue; the ductwork could not be finished until the pipe moved.

Did you get it right? Let us know!

Thank you to Phil McCrory, QCxP, Field Engineer, for capturing this.

...